Previous Projects:

We are committed to providing our clients with the highest level of service so that they will come back to us again.  We try to make the process of restoration as easy as possible while providing quality and value in what we do.  Listed below are some recent projects showing services rendered as a subcontractor to the listed prime contractor.

  • 2010, 2009, 2008- Kootenai Tribe of Idaho.  Work included erosion blanket installation, wildlife fence construction, and tree & shrub planting.
  • 2010, 2009, 2008- Parsons RCI, Inc. (Federal Aid Project/Idaho Transportation Department) Sandpoint North & South.  Work included erosion control (hydro-seeding), erosion blanket installation, tree & shrub planing, Sand Creek restoration (plant 45,000 willows, i.e., brush layers, brush mattresses, fascines, root wads, log structures, wetland sod, irrigation and maintenance.
  • 2010, 2009- Sletten Construction Co. Idaho Transportation Department Dover Bridge Replacement.  Work included erosion control, wetland mitigation, soil stabilization, erosion blanket installation.
  • 2010- Noble Excavation Inc., Flathead County Landfill in Montana.  Work included installation of erosion control fiber rolls, and hydro-seed.
  • 2010, 2009- Noble Excavation Inc., Bonneville Power Administration, Libby to Troy Montana Transmission Line.  Work included soil stabilization, repelling steep banks to install erosion blanket, stream side planting, and hydro-seeding.
  • 2009- Sackett Construction, Retaining wall installation on Pend Orielle Lake in Hope, Idaho.  Work included installing 1,500 feet of turbidity curtain.
  • 2007, 2006, 2005- Max J. Kuney Co., Setters to Bellgrove Stage 2 (Federal Aid Project/Idaho Transportation Department).  Work included Lake Creek restoration, erosion blanket installation, tree planting, bio-log installation, and hydro-seeding. T.E.R.O. compliance with the Coeur d'Alene Tribe.
  • 2006, 2005, 2004- S.A. Gonzales Constructions, Setters to Bellgrove Stage 1 (Federal Aid Project/Idaho Transportation Department). Work included Fighting Creek restoration, hydro-seeding, planting, wetland mitigation, erosion blanket and bio-log installation.